Skip to content
Contact us
Menu

Projects

Every row is a delivered package, with client, year and contract value as listed in the company portfolio.

33

projects and packages delivered

161million SAR

total published contract value
Division
Sort by

33 of 33 rows

YearClientProjectDivisionValue
2023SAJCOSurface Rock Cutting Works in the NEOM SpineSAJCO · 2023 · MiningSAR 29,500,000MiningSAR 29,500,000
2021SAJCOInfrastructure Works for NEOM Bay Project – Site 4SAJCO · 2021 · ConstructionSAR 24,000,000ConstructionSAR 24,000,000
2022SAJCOInfrastructure Works for NEOM Bay Project – Site 6SAJCO · 2022 · ConstructionSAR 23,175,000ConstructionSAR 23,175,000
2022SHAJVTHE LINE Main Eastern TunnelsSHAJV · 2022 · MiningSAR 22,011,000MiningSAR 22,011,000
2022CRCCTHE LINE Side Tunnels ProjectCRCC · 2022 · MiningSAR 15,975,000MiningSAR 15,975,000
2019OAB ContractingIntersection of Imam Muslim Road and Prince Naif Ibn Abdulaziz RoadOAB Contracting · 2019 · ConstructionSAR 12,400,000ConstructionSAR 12,400,000
2018OAB ContractingHail Road Completion ProjectOAB Contracting · 2018 · ConstructionSAR 7,447,514ConstructionSAR 7,447,514
2021CRCCRock cutting with various relevant work (Western Package)CRCC · 2021 · MiningSAR 4,750,000MiningSAR 4,750,000
2021CRCCRock cutting with various relevant work (Eastern Package)CRCC · 2021 · MiningSAR 3,900,000MiningSAR 3,900,000
2023Archirodon ACCE JVAmaala Staff Village Zone 4 Project (concrete)Full structural execution; owner Red Sea GlobalArchirodon ACCE JV · 2023 · ConstructionSAR 3,209,942ConstructionSAR 3,209,942
2019Al AyuniInfrastructure Works for RUA Al Madinah ProjectAl Ayuni · 2019 · ConstructionSAR 2,250,000ConstructionSAR 2,250,000
2023SabayturRed Sea Marine Life Institute ProjectStructural and finishing worksSabaytur · 2023 · ConstructionSAR 2,016,386ConstructionSAR 2,016,386
2019OAB ContractingCompletion of the Remaining Section of Hail RoadOAB Contracting · 2019 · ConstructionSAR 1,900,836ConstructionSAR 1,900,836
2023Archirodon ACCE JVAmaala Staff Village Zone 4 Project (finishing)Archirodon ACCE JV · 2023 · ConstructionSAR 1,500,000ConstructionSAR 1,500,000
2022OAB ContractingPreliminary Site Works for Saudi Entertainment Ventures (SEVEN) Project at King Fahd Park, MadinahOAB Contracting · 2022 · ConstructionSAR 1,147,695ConstructionSAR 1,147,695
2022OAB ContractingRock Cutting Works at Ouda Al-Baladi Crusher SiteOAB Contracting · 2022 · MiningSAR 984,745MiningSAR 984,745
2022Al AyuniDrilling and Boring Works for Rock Cutting Operations in RUA Al MadinahAl Ayuni · 2022 · MiningSAR 840,000MiningSAR 840,000
2023Alfanar CoAlfanar NEOM Construction Villages (NCV) – Package 13-14Alfanar Co · 2023 · ConstructionSAR 713,587ConstructionSAR 713,587
2023Alfanar CoAlfanar NEOM Construction Villages (NCV) – Package 19Alfanar Co · 2023 · ConstructionSAR 589,814ConstructionSAR 589,814
2023Alfanar CoAlfanar NEOM Construction Villages (NCV) – Package 26Alfanar Co · 2023 · ConstructionSAR 461,216ConstructionSAR 461,216
2023Alfanar CoAlfanar NEOM Construction Villages (NCV) – Package 11-12Alfanar Co · 2023 · ConstructionSAR 419,674ConstructionSAR 419,674
2023Alfanar CoAlfanar NEOM Construction Villages (NCV) – Package 13-14Alfanar Co · 2023 · ConstructionSAR 403,484ConstructionSAR 403,484
2023Alfanar CoAlfanar NEOM Construction Villages (NCV) – Package 11-12Alfanar Co · 2023 · ConstructionSAR 402,964ConstructionSAR 402,964
2023Alfanar CoAlfanar NEOM Construction Villages (NCV) – Package 26Alfanar Co · 2023 · ConstructionSAR 378,731ConstructionSAR 378,731
2023Alfanar CoAlfanar NEOM Construction Villages (NCV) – Package 17Alfanar Co · 2023 · ConstructionSAR 368,737ConstructionSAR 368,737
2023Alfanar CoAlfanar NEOM Construction Villages (NCV) – Package 19Alfanar Co · 2023 · ConstructionSAR 265,364ConstructionSAR 265,364
2023SabayturTriple Bay Amaala Yacht Club ProjectSabaytur · 2023 · ConstructionSAR 234,908ConstructionSAR 234,908
Ouda Al-Baladi & SonsWadi Tabuk Stormwater Drainage CanalStormwater drainage canal, 2.2 kmOuda Al-Baladi & Sons · ConstructionValue not disclosedConstructionValue not disclosed
Alfanar CoAlfanar Camp Monitoring – NEOMCamp monitoring across multiple NEOM sites, 500 camerasAlfanar Co · SecurityValue not disclosedSecurityValue not disclosed
Alfanar Building SystemsAl Ghuroub Residential ProjectFinishing works for 150 villasAlfanar Building Systems · ConstructionValue not disclosedConstructionValue not disclosed
Fleet Tracking System – Tabuk and Jabal Al-LawzGPS fleet tracking, 100 vehiclesSecurityValue not disclosedSecurityValue not disclosed
Police Weapons and Explosives CentreSolar power, surveillance cameras and wireless data linksSecurityValue not disclosedSecurityValue not disclosed
CRCCCRCC Tunnel MonitoringTunnel monitoring system, 80 camerasCRCC · SecurityValue not disclosedSecurityValue not disclosed

Security installations

  • Alfanar Camp Monitoring – NEOM

    Alfanar Co · NEOM

    500

    cameras

    Camp monitoring across multiple NEOM sites, 500 cameras

  • Fleet Tracking System – Tabuk and Jabal Al-Lawz

    Tabuk and Jabal Al-Lawz

    100

    vehicles

    GPS fleet tracking, 100 vehicles

  • Police Weapons and Explosives Centre

    Solar power, surveillance cameras and wireless data links

  • CRCC Tunnel Monitoring

    CRCC

    80

    cameras

    Tunnel monitoring system, 80 cameras

Tell us about your package

Send us the scope of work through the contact form or by email.

Contact us