Services
Rock and structural cutting to world-class standards
100,000,000m³
surface excavation10,000,000m³
tunnel excavation
Mining, Drilling and Rock Cutting
Surface and tunnel drilling and rock cutting with vibration control, from quarry extraction to giga-project tunnel packages.
7
projects delivered78million SAR
total published contract valueScope of work
- Extraction
- Site preparation
- Heavy equipment operation
- Surface rock cutting
- Tunnel drilling and rock cutting with vibration control
Delivered work
| Client | Project | Year | Value | |
|---|---|---|---|---|
| SAJCO | Surface Rock Cutting Works in the NEOM Spine | SAJCO · 2023 | 2023 | SAR 29,500,000 |
| SHAJV | THE LINE Main Eastern Tunnels | SHAJV · 2022 | 2022 | SAR 22,011,000 |
| CRCC | THE LINE Side Tunnels Project | CRCC · 2022 | 2022 | SAR 15,975,000 |
| CRCC | Rock cutting with various relevant work (Western Package) | CRCC · 2021 | 2021 | SAR 4,750,000 |
| CRCC | Rock cutting with various relevant work (Eastern Package) | CRCC · 2021 | 2021 | SAR 3,900,000 |
| OAB Contracting | Rock Cutting Works at Ouda Al-Baladi Crusher Site | OAB Contracting · 2022 | 2022 | SAR 984,745 |
| Al Ayuni | Drilling and Boring Works for Rock Cutting Operations in RUA Al Madinah | Al Ayuni · 2022 | 2022 | SAR 840,000 |

Construction and Infrastructure
Civil works from substructure to finishing, plus roads, utilities and stormwater networks for developers and main contractors.
22
projects delivered83million SAR
total published contract valueScope of work
- Residential, commercial and administrative buildings
- Substructure: excavation, backfill, foundations, basements and retaining walls
- Superstructure: columns, bridges and slabs
- Finishing: block, plaster, paint, tiles, gypsum board, marble, doors and windows
- Roads and utilities: highways, secondary roads, site development and utility networks
- Stormwater drainage networks
Delivered work
| Client | Project | Year | Value | |
|---|---|---|---|---|
| SAJCO | Infrastructure Works for NEOM Bay Project – Site 4 | SAJCO · 2021 | 2021 | SAR 24,000,000 |
| SAJCO | Infrastructure Works for NEOM Bay Project – Site 6 | SAJCO · 2022 | 2022 | SAR 23,175,000 |
| OAB Contracting | Intersection of Imam Muslim Road and Prince Naif Ibn Abdulaziz Road | OAB Contracting · 2019 | 2019 | SAR 12,400,000 |
| OAB Contracting | Hail Road Completion Project | OAB Contracting · 2018 | 2018 | SAR 7,447,514 |
| Archirodon ACCE JV | Amaala Staff Village Zone 4 Project (concrete) | Archirodon ACCE JV · 2023 | 2023 | SAR 3,209,942 |
| Al Ayuni | Infrastructure Works for RUA Al Madinah Project | Al Ayuni · 2019 | 2019 | SAR 2,250,000 |
| Sabaytur | Red Sea Marine Life Institute Project | Sabaytur · 2023 | 2023 | SAR 2,016,386 |
| OAB Contracting | Completion of the Remaining Section of Hail Road | OAB Contracting · 2019 | 2019 | SAR 1,900,836 |
| Archirodon ACCE JV | Amaala Staff Village Zone 4 Project (finishing) | Archirodon ACCE JV · 2023 | 2023 | SAR 1,500,000 |
| OAB Contracting | Preliminary Site Works for Saudi Entertainment Ventures (SEVEN) Project at King Fahd Park, Madinah | OAB Contracting · 2022 | 2022 | SAR 1,147,695 |
| Alfanar Co | Alfanar NEOM Construction Villages (NCV) – Package 13-14 | Alfanar Co · 2023 | 2023 | SAR 713,587 |
| Alfanar Co | Alfanar NEOM Construction Villages (NCV) – Package 19 | Alfanar Co · 2023 | 2023 | SAR 589,814 |
| Alfanar Co | Alfanar NEOM Construction Villages (NCV) – Package 26 | Alfanar Co · 2023 | 2023 | SAR 461,216 |
| Alfanar Co | Alfanar NEOM Construction Villages (NCV) – Package 11-12 | Alfanar Co · 2023 | 2023 | SAR 419,674 |
| Alfanar Co | Alfanar NEOM Construction Villages (NCV) – Package 13-14 | Alfanar Co · 2023 | 2023 | SAR 403,484 |
| Alfanar Co | Alfanar NEOM Construction Villages (NCV) – Package 11-12 | Alfanar Co · 2023 | 2023 | SAR 402,964 |
| Alfanar Co | Alfanar NEOM Construction Villages (NCV) – Package 26 | Alfanar Co · 2023 | 2023 | SAR 378,731 |
| Alfanar Co | Alfanar NEOM Construction Villages (NCV) – Package 17 | Alfanar Co · 2023 | 2023 | SAR 368,737 |
| Alfanar Co | Alfanar NEOM Construction Villages (NCV) – Package 19 | Alfanar Co · 2023 | 2023 | SAR 265,364 |
| Sabaytur | Triple Bay Amaala Yacht Club Project | Sabaytur · 2023 | 2023 | SAR 234,908 |
| Ouda Al-Baladi & Sons | Wadi Tabuk Stormwater Drainage Canal | Ouda Al-Baladi & Sons | — | Value not disclosed |
| Alfanar Building Systems | Al Ghuroub Residential Project | Alfanar Building Systems | — | Value not disclosed |

Security and Smart Systems
Surveillance, access control, fleet tracking and off-grid power for remote camps, tunnels and sites.
4
projects deliveredScope of work
- Large-scale CCTV systems
- Tunnel monitoring
- Camp monitoring with access control
- GPS fleet tracking
- Wireless data links
- Solar-powered off-grid surveillance
Delivered work
| Client | Project | Year | Value | |
|---|---|---|---|---|
| Alfanar Co | Alfanar Camp Monitoring – NEOM | Alfanar Co | — | Value not disclosed |
| CRCC | CRCC Tunnel Monitoring | CRCC | — | Value not disclosed |
| — | Fleet Tracking System – Tabuk and Jabal Al-Lawz | — | Value not disclosed | |
| — | Police Weapons and Explosives Centre | — | Value not disclosed |
Tell us about your project
Send us the scope of work through the contact form or by email.